Hearing Examiner Projects and Associated Documents
Hearing Examiner Decision
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing
Attachment b Zoning Vicinity Map
Attachment c Master Application, received June 28, 2019
Attachment d JARPA permit Application, received June 28, 2019
Attachment e Site plan, received June 28, 2019
Attachment f Notice of Application, dated January 3, 2020
Attachment g Shoreline Administrative Exemption, Approval Letter, Scott McCormick, July 1, 2020; Project #2019103224 Folder Seq. No. 19 108060 XL - Boathouse Repair
Attachment h Comment Memorandum from Amy Crass, Thurston County Public Health & Social Services Department, dated August 8, 2019
Attachment i Comment letter, Nisqually Indian Tribe, January 13, 2019
Attachment j Comment letter, Squaxin Island Tribe, January 3, 2020
Attachment k Site Assessment - Parcel 13936340700. Technical Memorandum, KPFF; dated June 3, 2019; submitted June 28, 2019
Attachment l Steep Slope/Landslide Hazard Assessment, Insight Geologic, dated September 24, 2018; received June 28, 2019
Attachment m Comment Letter, Dept. of Ecology, Southwest Regional Office, January 23, 2020
Attachment n Comment Letter, Dept. of Ecology, Southwest Regional Office, July 29, 2019
Attachment o Email, Dept. of Ecology, Lizzie Carp, August 15, 2023
Attachment p FEMA Habitat Assessment, KPFF Consulting Engineers, February 6, 2020
Hearing Examiner Decision
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing
Attachment b Zoning/Site Map
Attachment c Master Application, received July 13, 2022
Attachment d Updated Division of Land Application received May 24, 2023
Attachment e Narrative Summary, dated May 16, 2023
Attachment f Preliminary Plat Map and landscaping plans received May 24, 2023
Attachment g Notice of Application for Prelim. Plat dated October 7, 2022 with adjacent property owners list dated October 6, 2022
Attachment h Master Application for Hearing Examiner Variance received September 22, 2023
Attachment i Hearing Examiner Variance Application received September 22, 2023
Attachment j Variance narrative received September 22, 2023
Attachment k Notice of Application for Hearing Examiner Variance dated October 6, 2023
Attachment l Final SEPA Mitigated Determination of Nonsignificance
Attachment m Mitigated Determination of Nonsignificance issued on August 30, 2023
Attachment n SEPA Environmental Checklist received May 24, 2023
Attachment o Sienna 1 Plat Trip Generation Assessment received July 13, 2022
Attachment p Additional Trip Generation Assessment for Sienna 1 received June 2, 2023
Attachment q Tree Protection and Replacement Plan by Washington Forestry Consultants Inc. dated August 9, 2004
Attachment r Settlement Agreement between the owner and Thurston County regarding the Thurston County Habitat Conservation Plan received July 13, 2022.
Attachment s Mazama Pocket Gopher and Thurston County Regulated Prairie Absence Report dated June 20, 2022
Attachment t Integrated Pest Management Plan received July 13, 2022
Attachment u Narrative for the “Existing” Septic System received May 24, 2023
Attachment v Existing Well Exhibit for Sienna 1 Plat (undated)
Attachment w Preliminary approval memo from Arthur Saint, PE with Thurston County Public Works Development Review dated September 21, 2023
Attachment x Preliminary approval mem from Dawn Peebles with Thurston County Public Health and Social Services Dept., Environmental Health section dated October 27, 2023
Attachment y Email from Jared Crews with the City of Tumwater to Scott McCormick TC CPED dated September 19, 2023 regarding the SEPA determination and requested conditions by the City
Attachment z Email from Jared Crews with the City of Tumwater to Scott McCormick TC CPED dated August 31, 2023 regarding the SEPA determination and requested conditions by the City
Attachment a1 Email from Scott McCormick, TC CPED to Tyrell Bradley (point of contact for applicant) regarding incompatible use standards dated August 2, 2023
Attachment b1 Comment Letter from the City of Tumwater to Scott McCormick, TC CPED dated June 12, 2023 regarding plat conditions
Attachment c1 Comment Letter from the City of Tumwater to Scott McCormick, TC CPED dated October 27, 2022 regarding plat conditions and review
Attachment d1 Communication Matrix from Thurston County CPED to the applicant dated February 15, 2023
Attachment e1 Thurston County Public Works comment Matrix with attached comment Memo to Arthur Saint, PE from Zach Severs PE, Public Works Water Resources dated January 26, 2023
Attachment f1 Updated Memo of Attachment e1 (directly above)
Attachment g1 Email from George Cowan (neighbor to the west) to Scott McCormick, TC CPED dated October 30, 2023
Attachment h1 Letter from the WA Dept. of Ecology dated October 27, 2022 regarding stormwater, solid waste and toxics
Attachment i1 Email from George Cowan (neighbor to the west) to Scott McCormick, TC CPED dated October 25, 2023
Attachment j1 Thurston County 2022 DDECM Project Info. & Elements Checklist (undated)
Attachment k1 Stormwater Pollution Prevention Site Plan Checklist received May 24, 2023
Attachment l1 Analysis Procedures for Infiltration BMPs Checklist received May 24, 2023
Attachment m1 Geotechnical/Infiltration Facility Checklist received May 24, 2023
Attachment n1 Drainage Report Elements Checklist (undated)
Attachment o1 Checklist LID.02 Post-Construction Soil Quality and Depth received May 24, 2023
Attachment p1 Construction Plan Elements Checklist (undated)
Attachment q1 LID Infeasibility Criteria Checklist
EXHIBIT 2 Drainage Report by LDC Inc. dated May 2023
EXHIBIT 3 Full sized plat map received May 26, 2023
EXHIBIT 4 Recorded plat of Sienna 2
EXHIBIT 5 Sienna II Stormwater Technical Memorandum, dated January 10, 2023
Hearing Examiner Decision-Due December 14th or 18th
- The record is held open through 11/30 for public comment from members of the public who tried to join the virtual hearing but were unable to join/make comment for technology or access reasons.
- If there is no post-hearing comment, the record will close 11/30 and the 10-business day decision deadline is 12/14.
- If there is post-hearing comment, Staff and Applicant have until close of business 12/4 to respond in writing, the record closes on 12/4, and the 10-business day decision deadline is 12/18.
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing, November 13, 2023
Attachment b Master Application, received May 3, 2022
Attachment c Reasonable Use Exception application, received May 3, 2022 and revised Feb 6, 2023
Attachment d Site plan, received May 3, 2022 and revised October 3, 2023
Attachment e Project Narrative, received May 3, 2022and February 6, 2023
Attachment f Wetland Delineation and Mitigation Report, received May 3, 2022 and revised Feb 6, 2023
Attachment g Notice of Application for Reasonable Use Exception dated May 18, 2022
Attachment h Comment Letter from Squaxin tribe, May 24, 2022
Attachment i Comment Letter from Nisqually tribe, January 3, 2022
Attachment j Comment Memo from Thurston County Environmental Health, dated December 14, 2022
Attachment k Communications Matrix, received Oct 31, 2022 and February 6, 2023
Attachment l Applicant’s response to Communications Matrix, received September 6, 2023
Attachment m Impervious Surface Worksheet, received October 3, 2023
Attachment n site plan showing septic and drainfield locations, received September 6, 2023
Attachment o request to end the monitoring
Hearing Examiner Decision-Due December 14th or 18th
- The record is held open through 11/30 for public comment from members of the public who tried to join the virtual hearing but were unable to join/make comment for technology or access reasons.
- If there is no post-hearing comment, the record will close 11/30 and the 10-business day decision deadline is 12/14.
- If there is post-hearing comment, Staff and Applicant have until close of business 12/4 to respond in writing, the record closes on 12/4, and the 10-business day decision deadline is 12/18.
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing dated November 17, 2023
Attachment b Zoning/Vicinity Map
Attachment c Master and JARPA SSDP Application received April 7, 2023
Attachment d Master and JARPA CUP Application received October 12, 2023
Attachment e Notice of Application for Shoreline permit May 17, 2023
Attachment f Site plans received April 11, 2023, May 8, 2023, and November 1, 2023
Attachment g Geotechnical Report from Insight Geologic, dated October 11, 2022
Attachment h Comments from County Geotechnical Staff, dated June 15, 2023
Attachment i Applicant response to County matrix requests, submitted October 5, 2023
Attachment j Approval Memos from Thurston County Environmental Health dated August 17, 2023, and October 31, 2023; including letter from Jim Hunter and Associates Septic Design
Attachment k Comment email from the Squaxin Tribe dated May 30, 2023
Attachment l Comments from the Nisqually Tribe dated May 18, 2023, and October 18, 2023
Hearing Examiner Decision- Due November 30th
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing
Attachment b Zoning Map
Attachment c Master and Reasonable Use Exception Application, received July 31, 2023
Attachment d RUE Narrative, received July 31, 2023
Attachment e Site Plan, received July 31, 2023
Attachment f Notice of Application, dated August 11, 2023
Attachment g Comment Memorandum from Lisa Christensen, Thurston County Public Health and Social Services Department, dated October 24, 2023
Attachment h Comment email from Shaun Dinubilo, Squaxin Island Tribe, dated August 21, 2023
Attachment i Applicant photos
Attachment j Public comments submitted, and County response
Attachment k Applicant email responses to public comments and request for additional project narrative, and County response
Attachment l Applicant’s additional mitigation information and photos
Attachment m Comments from Brad Beach, Nisqually Indian Tribe, dated August 24, 2023
Exhibit 2 Email from applicant correcting the number of existing structures listed in the staff report
Hearing Examiner Decision-The Record will close on December 15th
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments:
Attachment-A Legal Notice, Dated: 11.03.2023
Attachment-B Master Application, Dated: 11.14.2022
Attachment-C Special Use-Application, Dated: 11.14.2022
Attachment-D Site Plan 2022105705, Dated: 11.14.2022
Attachment-E Notice of Application, Dated: 01.27.2023
Attachment-F Current As-Built Plans, Dated: 01.15.2008
Attachment-G SEPA DNS Lakeside Asphalt-Project, Dated: 09.29.2023
Attachment-H Hearing Examiner Decision project #2019102295, Dated: 07.01.2021
Attachment-I Pocket Gopher Report, Dated: 07.13.2022
Attachment-J Email from County Accepting Trip Generation Report 09.13.2022
Attachment-K SEPA Checklist, Dated November 14, 2022
Attachment-L Superior Court Final Order, Dated: 07.08.2002
Attachment-M Noise Monitoring Plan, Dated: 09.21.2022
Attachment-N Traffic Trip Generation Memo, Dated: 09.21.20220
Attachment-O Drainage Report, Dated: 11.14.2022
Attachment-P Durgin Rd. RAP Cover Letter, Dated: 11.14.22
Attachment-Q Groundwater Monitoring-Sampling Results, Dated: 10.14.2022
Attachment-R Interim Cover Letter Update, Dated: 06.26.2023
Attachment-S Lakeside Court of Appeals Mandate, Dated: 11.9.2004
Attachment-T Final Agreed Condition Language, Dated: 06.02.2021
Attachment-U Squaxin Island Tribe Comments, Dated: 02.02.2023
Attachment-V ORCAA comments, Dated: 02.06.2023
Attachment-W Ecology Comments, Dated: 02.16.2023
Attachment-X Ecology Comments, Dated: 10.12.2023
Attachment-Y Kevin Hansen Hydrogeologist Comment, Dated: 08.01.2023
Attachment-Z Public Works Recommendation of Approval, Dated: 07.31.2023
Attachment-AA Public Comments
Attachment-BB Environmental H. Recommendation of Approval, Dated: 11.06.2023
Exhibit 2 Errata Memorandum Correcting Errors in the Staff Report, Dated November 13, 2023
Exhibit 3 Revised Community Planning and Economic Development Staff Report Revision with markings
Corrected Hearing Examiner Decision
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment a Notice of Public Hearing, dated October 13, 2023
Attachment b Master and JARPA Applications, received October 21, 2022
Attachment c Site Plans, received October 21, 2022
Attachment d Notice of Application, dated November 12, 2022
Attachment e Site photos, received November 2, 2022
Attachment f Topographic Survey, dated September 20, 2022
Attachment g Structural calculations by Mud Bay Geotechnical Services, dated June 9, 2022
Attachment h Geotechnical Report by Mud Bay Geotechnical Services, dated September 15, 2022
Attachment i Septic record drawing, approved by TC EH August 22, 2017
Attachment j Wastewater and Sewage system inspection report, dated June 7, 2023
Attachment k Work Invoice from Hatten & Sons Landworks, LLC, dated January 18, 2023
Attachment l Technical Assistance Memo & Planting Plan by Thurston Conservation District, dated October 2021
Attachment m Purchased and Installed Plant List from TCD, received June 26, 2023
Attachment n Native Plant Purchase Confirmation List, dated November 14, 2022
Attachment o Site photos of new plantings, received June 26, 2023
Attachment p Comment Memorandum from Nisqually Island Tribe, dated November 28, 2022
Attachment q Comment email from WA Dept of Ecology, dated April 10, 2023
Attachment r Comment Memorandum from Environmental Health, dated September 29, 2023
Attachment s Communication Matrix #1, dated March 22, 2023
Attachment t Email from Mark Biever, Thurston County Geotechnical Engineer, dated October 6, 2022
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment a Notice of Public Hearing, dated October 13, 2023
Attachment b Master and JARPA SSDP Applications received November 15, 2022
Attachment c Site Plans and Aerials, received November 15, 2022
Attachment d SEPA Categorical Exemption, received November 15, 2022
Attachment e Notice of Application, dated February 10, 2022
Attachment f Comment Memorandum from Nisqually Indian Tribe, dated February 14, 2023
Attachment g Comment email from WA Department of Ecology, dated February 13, 2023
Attachment h Communication Matrix #1, dated April 28, 2023
Attachment i Updated Site Plans and Mechanical Drawings, emailed July 6, 2023
Attachment j Updated JARPA Cover Sheet, emailed July 6, 2023
Attachment k Updated JARPA form, emailed July 6, 2023
Attachment l Email from Applicant to WA Dept of Ecology, emailed May 8, 2023
Attachment m Comment Memorandum from Environmental Health, dated May 4, 2023
Attachment n Comment Memorandum from Public Works, dated March 30, 2023
Attachment o JARPA Exemption site plan (Folder #93-030071-540 XL), dated July 16, 1993
Attachment p Wetland Delineation Map created for another project, dated January 12, 2018
Attachment q Tolmie State Park Delineation Map
Attachment r Existing Lift Station Record Drawings (1973)
Exhibit 2 Staff revised condition, October 25, 2023
Exhibit 3 Revised site plan, November 7, 2023
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment A Master Application date stamped, 12.13.22
Attachment B Special Use Permit Application date stamped, 12.13.22
Attachment C Project Narrative date stamped, 12.13.22
Attachment D Coverage Objective and Need Statement date stamped, 12.13.22
Attachment E Balloon Test Notice and Results date stamped, 12.13.22
Attachment F Legal Description/Survey date stamped, 12.13.22
Attachment G SEPA Checklist and Application date stamped, 12.13.22
Attachment H Geologic Hazard Assessment date stamped, 12.13.22
Attachment I Site Drawings and Plans date stamped, 06.15.23
Attachment J Wetland Report date stamped, 06.15.23
Attachment K Timber Cruise Report date stamped, 12.13.22
Attachment L Wells Report date stamped, 12.13.22
Attachment M NEPA Checklist date stamped, 12.13.22
Attachment N Phase 1 Environmental Assessment date stamped, 12.13.22
Attachment O Summary of Response to Wetland Report date stamped, 06.15.23
Attachment P Colocation letter date stamped, 06.15.23
Attachment Q Property Owner Statement dated, 4.17.23
Attachment R ARX Wireless Safety and FAA Compliance Certifications date stamped, 06.15.23
Attachment S ARX Wireless FAA Determination of No Hazard dated, 10.13.22
Attachment T Siting Alternatives dated, 06.13.23
Attachment U Residential WCF location statement dated, 06.06.23
Attachment V 3rd Party Review dated, 04.06.23
Attachment W Notice of Application dated, 02.24.23
Attachment X SEPA Determination dated, 08.23.23
Attachment Y Letter of Intent dated, 01.12.23
Attachment Z Color and Noise Statement dated, 12.13.22
Attachment AA Radio Station Authorizations date stamped, 12.13.22
Attachment BB Drainage Report date stamped, 12.13.22
Attachment CC Removal/Colocation Agreement date stamped, 12.13.22
Attachment DD Colocation Letters and Certified Mail Receipts date stamped, 12.13.22
Attachment EE Radio Frequency Electromagnet Energy Compliance Report date stamped, 12.13.22
Attachment FF US Department of Interior – USFWS Concurrence Letter dated stamped, 06.15.23
Attachment GG Public Hearing Notice dated, October 3, 2023
Attachment HH Environmental Health recommendation of approved dated, October 10, 2023
Attachment II Public Works recommendation of approval dated, May 10, 2023
Attachment JJ Agency Comments Received
Attachment KK Public Comments Received
Exhibit 2 ARX Wireless Pre-hearing Brief, dated October 10, 2023
Exhibit 2A Engineer Letter
Exhibit 2B Proximity Impact Analysis
Exhibit 2C RS Design Analysis
Exhibit 2D RF Justification Letter
Exhibit 2E Viewshed Analysis
Exhibit 2 F Informal Biological Analysis
Exhibit 3 Public comment from Brandon Kaiser, received October 12, 2023
Exhibit 3A Public comment from Kathleen Connor, received October 15, 2023
Exhibit 3B Public comment from Dorothy Lyons, received October 16, 2023
Exhibit 3C Public comment from Kathleen Connor, received October 16, 2023
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment A Notice of Public Hearing dated, 09.08.2023
Attachment A1 Notice of Public Hearing for Publishing, dated September 29, 2023
Attachment B.1 Master & Reasonable Use Exception App. received, 08.10.2021
Attachment B.2 Master & Joint Aquatic Resource Protection App. received, 05.11.2023
Attachment C.1 Original Project Narrative dated, 08.10.2021
Attachment C.2 Revised Project Description 2023
Attachment D.1 Communication Matrix, S. Planner, Kraig Chalem, dated, 10.10.2021
Attachment D.2 Communication Matrix, S. Planner, Kraig Chalem, dated, 01.27.2023
Attachment D.3 Reply to Communication Matrix, S. Planner, Kraig Chalem, 05.11.2023
Attachment E Comment Brad Beach, Nisqually Indian Tribe dated, 08.17.2023
Attachment F Comment email from Shaun Dinubilo, Squaxin Island Tribe dated, May 10, 2021
Attachment G Comment Thurston County Public Health and Social Services Department, dated, 10.04.2023
Attachment H Mark Biever Comment of Geotechnical Report dated, 10.04.2023
Attachment I Geotechnical Report, by: Mud Bay Geotechnical Services, LLC, dated, 04.29.2023
Attachment J 01.04.1989_Property.Survey
Attachment K Revised Site Plan dated, 05.11.2023
Attachment L E.H. Memo #2 Comments dated 11.03.2021
Attachment M Impervious Coverage Calculation dated, 07.20.2023
Attachment N Drainage-Stream Type Assessment - Agua Tierra dated, 09.20.2009
Attachment O WDFW – HPA Permit dated, 08.10.2021
Attachment P Floodplain Habitat Assessment Report dated, 08.10.2021
Attachment Q Elevation Certificate for W. & E. Residences received, 08.10.2021
Exhibit 2A Site Plan with Existing Structures, dated 11.8.21
Exhibit 2B Site Plan, dated 11.8.21
Exhibit 3 Hydraulic Project Approval, dated 6.1.20
Exhibit 4 2013 Geotechnical Report, dated 4.22.2013
Exhibit 5 Comment from Shaun Dinubilo amended recommendation, dated May 25, 2023
Exhibit 6A Email from the Applicant, dated October 24, 2023
Exhibit 6B Plant list – undated, no author given
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment a Notice of Public Hearing dated September 15, 2023
Attachment b Zoning/Vicinity Map
Attachment c Master and JARPA Application received November 9, 2022, with revised JARPA Application received May 17, 2023
Attachment d Master and Shoreline Administrative Variance Application received November 9, 2022
Attachment e Master and RUE Application received May 17, 2023
Attachment f Notice of Application for Shoreline permits dated December 7, 2022, and for RUE permit dated June 2, 2023
Attachment g Benn Shoreline 300 ft measurements exhibit
Attachment h Shoreline Planting plan dated February 1, 2023
Attachment i Revised site plan dated July 18, 2023
Attachment j Variance criteria narrative, submitted May 17, 2023
Attachment k RUE Project narrative, submitted May 17, 2023
Attachment l Geotechnical Report from Quality Geo NW, dated August 15, 2022
Attachment m Habitat Assessment from Russell and Associates, dated July 13, 2023
Attachment n Survey site plan for flood review, dated April 2022
Attachment o Approval Memos from Thurston County Environmental Health dated January 11, 2023 and August 2, 2023
Attachment p Comment emails from the Squaxin Tribe dated December 13, 2022, and April 6, 2023
Attachment q Comments from the Nisqually Tribe dated December 14, 2022, March 29, 2023, and June 13, 2023
Attachment r Comments from the Department of Archaeology and Historic Preservation, March 29, 2023
Attachment s Inadvertent Discovery Plan for Thurston County
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment a Notice of Public Hearing dated September 15, 2023
Attachment b Zoning/Vicinity Map
Attachment c Master and Revised JARPA Application SSDP received June 14, 2022
Attachment d SSDP Revised Project Narrative dated January 23, 2023
Attachment e Master and JARPA Application CUP received May 10, 2023
Attachment f Additional notes on Retaining wall replacement dated May 10, 2023
Attachment g Notice of Application for Shoreline permits dated January 29, 2021 for SSDP, and May 26, 2023 for CUP
Attachment h Topographic Survey dated February 2022
Attachment i Shoreline Mitigation plan dated May 2, 2023
Attachment j Revised site plan and boat house plan, dated January 25, 2023
Attachment k Hydraulic Project Approval application issued by WDFW, dated February 23, 2022
Attachment l Conditional Use permit responses, submitted May 10, 2023
Attachment m Retaining wall design letter, dated June 13, 2022
Attachment n Revised dock plan, dated January 24, 2023 and March 15, 2022
Attachment o Existing site plan and dock plan, dated March 9, 2020
Attachment p Revised site plan for mitigation, dated May 4, 2023
Attachment q Revised Environmental Checklist, received August 14, 2020
Attachment r Revised SEPA MDNS, issued August 11, 2023
Attachment s Soil sample results, dated October 15, 2021
Attachment t Asbestos survey results, dated July 14, 2020
Attachment u Approval Memos from Thurston County Environmental Health dated August 19, 2020 and August 4, 2023
Attachment v Comment email from the Squaxin Tribe dated April 29, 2020
Attachment w Comments from the Nisqually Tribe dated April 28, 2020, and June 1, 2023
Attachment x Comments from the Department of Ecology, dated May 10, 2020, and October 26, 2021
Attachment y Comments from ORCAA, dated May 5, 2020, January 18, 2023, and May 31, 2023
Attachment z Site photos, submitted April 15, 2020
Exhibit 2 Addendum HPA approved July 11, 2023
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing, August 28, 2023
Attachment b Master Application, dated December 27, 2022
Attachment c Reasonable Use Exception Application, dated December 27, 2022
Attachment d site plan, dated December 27, 2022 and revised May 5, 2023
Attachment e Wetland Delineation Report, dated December 27, 2022, and revised May 5, 2023
Attachment f Wetland Mitigation Plan, dated December 27, 2022, and revised May 5, 2023
Attachment g Impacts and Mitigation, dated December 27, 2022
Attachment h Notice of Application for Reasonable Use Exception dated January 6, 2023
Attachment i Comment letter from the Squaxin Tribe, January 9, 2023
Attachment j Comment letter from the Nisqually Tribe, January 10, 2023
Attachment k Environmental Health approval letter, January 12, 2023
Attachment l Mondau public comment, January 12, 2023
Attachment m Hannapel public comment 1, January 13, 2023
Attachment n Hannapel public January 19, 2023
Attachment o Hannapel letter, January 25, 2023
Attachment p Consultant reply to Hannapel, April 11, 2023
Attachment q Consultant’s reply to Mandau, April 11, 2023
Attachment r Hannapel public comment, May 5, 2023
Attachment s Hannapel easement title papers
Attachment t public comment request to receive notice
Attachment u Stricken
Attachment v Communications Matrix, dated May 5, 2023
Attachment w Communications Matrix, dated August 10, 2023
Attachment x Stricken
Attachment y Deed of Easement
Attachment z Public comment Hannapel, May 16, 2023
Attachment AA Clearing photos 1 from Hannapel
Attachment BB Clearing photos 2 from Hannapel
Attachment CC Hannapel comment on easement, dated August 28, 2023
Attachment DD revised Figure 2 for mitigation plan
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing, dated August 28, 2023
Attachment b Master Application, submitted August 3, 2021 and revised January 30, 2023
Attachment c Special Use Permit Application, submitted August 3, 2021
Attachment d Project Narrative, dated June 1, 2023, received July 10, 2023
Attachment e Variance for setback, received July 10, 2023
Attachment f Variance for co-location, received July 10, 2023
Attachment g Variance for Screening, received July 10, 2023
Attachment h Site plans, submitted November 21, 2022 and revised on Jan 13, 2022
Attachment i Notice of Application and SEPA Mitigated Determination of Non-Significance, dated March 23, 2022
Attachment j Site Justification Letter, received July 10, 2023
Attachment k Critical Areas Report, dated May 12, 2021
Attachment l Critical Area Aquifer Report, dated April 28, 2021
Attachment m Geotechnical Report, dated October 28, 2020
Attachment n FCC License Info
Attachment o NIER Report, dated October 14, 2020
Attachment p Balloon Test Map
Attachment q Acoustical report, dated August 28, 2020
Attachment r Photo Simulations
Attachment s Migratory Bird Impacts, dated May 14, 2021
Attachment t Structural Report, May 17, 2021
Attachment u Certified Sewage Site Plan prepared by Jim Hunter, September 1, 2022
Attachment v SEPA Checklist
Attachment w Title Report
Attachment x Temporary Erosion Control
Attachment y Comments from Department of Ecology, dated September 13, 2021
Attachment z Comment letter from the Nisqually Tribe dated August 30, 2021
Attachment AA Third Party Review, received February 14, 2023
Attachment BB Map of Closest Tower, received July 10, 2023
Attachment CC Noise Report, received July 10, 2023
Attachment DD Lighting Requirements, received July 10, 2023
Attachment EE Lighting Specifications, received July 10, 2023
Attachment FF Generator dBA, received July 10, 2023
Attachment GG Communications Matrix with Geotech comments, February 10, 2023
Attachment HH Communications Matrix, dated January 25, 2023
Attachment II Communications Matrix, received July 6, 2023
Attachment JJ Approval Memo from Amy Crass, Environmental Health, dated September 19, 2022
Attachment KK Approval memo from Arthur Saint with Thurston County Public Works dated January 25, 2023
Attachment LL Wetland Review Comments, dated February 7, 2023
Attachment MM Wetland Review Comments, dated August 15, 2023
Attachment NN Statement that the WCF/antenna support structure will comply with all Federal Aviation Administration (FAA) regulations and documentation indicating whether the FAA will require attachment of a light/signal to the proposed antenna support structure.
Attachment OO FAA Obstruction Marking and Lighting Circular
Attachment PP Statement that the WCF/antenna support structure is not feasible for co-location.
Attachment QQ Statement indicating exemption from the National Environmental Policy Act (NEPA) and all documents filed under NEPA.
Attachment RR SEPA checklist
Attachment SS Addendum to Setback Variance Request - Fire Station 82
Exhibits before the Hearing Examiner:
1. Staff Report including the following attachments
Attachment A Staff Project Hold Letter, Dated: 06.27.2022
Attachment B RUE. Applications, Submitted: 10.14.2022
Attachment C Variance Application, Submitted: 10.14.2022
Attachment D Notice of Application, Sent: 01.25.2023
Attachment E Legal Notice of Public Hearing, Issued: 07.28.2023
Attachment F Plat of Clearwood Div.8, AF#870538, Recorded: 06.15.1972
Attachment G Impervious Surface-worksheet, Submitted: 06.28.2022
Attachment H Geotech Report, Submitted: 10.14.2022
Attachment I Prairie Screening Data Sheet
Attachment J Environmental Health Comments, Provided: 03.17.2023
Attachment K Public Works; Development Approval Letter, Provided: 04.25.2023
Attachment L Public Works; Review of Geotech Report: Provided: 07.31.2023
Attachment M Nisqually NOA comments, Dated: 10.14.2022
Attachment N Squaxin NOA comments, Dated: 01.30.2023
Attachment O Prjt#2022101751-Site Plans, 10.14.2022
Attachment P Prjt#2022101751-RUE Narrative, 10.14.2022
Attachment Q Prjt#2022101751-Drainage Report, 10.14.2022
Attachment R Prjt#2022101751-Variance Narrative, 10.14.2022
Attachment S Prjt#2022101751-COWA, 03.29.2022
Attachment T Master & Septic Applications Site Plan, 04.12.2022
Exhibit 2 Staff Memorandum addressing whether any shoreline habitat review and protection is required pursuant to the critical areas ordinance, received August 11, 2023
Exhibit 3 Applicants response to staff memorandum, received August 13, 2023
Exhibits before the Hearing Examiner:
1. Staff Report including the following attachments
Attachment a Notice of Public Hearing, July 28, 2023
Attachment b Vicinity / Zoning Map
Attachment c Master Application dated July 24, 2020
Attachment d Special Use Permit Application dated July 24, 2020
Attachment e Master Application dated July 24, 2020 for SSDP
Attachment f JARPA Application dated July 24, 2020
Attachment g Master Application dated July 20, 2021 for RUE
Attachment h Reasonable Use Exception Application dated July 20, 2021
Attachment i Boy Scouts of America Pacific Harbors Council notice and description of project with Q&A (undated)
Attachment j Email from Robert Wubbena (POC) dated December 25, 2020 regarding description of project
Attachment k Boy Scouts of America Camp Thunderbird Waterfront and Wetlands Permitting Overview (undated)
Attachment l Boy Scouts of America Camp Thunderbird Swimming Area Improvements overview (undated)
Attachment m Applicant provided parking / emergency vehicle access information beginning with email from Arthur Saint to Robert Wubbena dated November 10, 2021
Attachment n Camp Thunderbird Solid Waste Management Program dated October 2020
Attachment o Camp Thunderbird Pest Management Plan & Hazardous Waste/Chemical Storage dated October 2020
Attachment p Appendix A – Abandonment of Existing Swim Pond & Boat Dock received July 20, 2021
Attachment q Appendix B – New Swim Area and Floats received July 20, 2021
Attachment r Appendix C – Dredging and Dewatering Operations (undated)
Attachment s Camp Thunderbird County Health Pest Control Plan stormwater information dated October 9, 2021
Attachment t Email from Robert Wubbena regarding rifle and archery locations (remaining in current locations) dated January 30, 2021
Attachment u Email from Robert Wubbena regarding Thurston County Environmental Health Departments requested information with responses dated September 25, 2020
Attachment v Notice of Application dated December 31, 2020
Attachment w Final SEPA Mitigated Determination of Nonsignificance dated June 7, 2023
Attachment x Combined Notice of Application for an RUE for dock in Category 1 wetland, with a SEPA Mitigated Determination of Nonsignificance dated April 5, 2023
Attachment y SEPA Environmental Checklist signed March 22, 2023
Attachment z Detailed Mitigation Plan, Revised by Confluence Environmental Co. dated February 2023 regarding Boy Scouts proposed swim / boat dock and wetland dredging
Attachment a1 Camp Thunderbird Critical Areas Report by SCJ Alliance dated March 2022
Attachment b1 Nisqually Indian Tribe comment, dated June 29, 2021
Attachment c1 Site Plan aerial (revised) received September 12, 2022, with
a. Aqua Storage / Swimmer Shower / Two Unit Toilet Floor Plan and elevations.
b. Eight Unit Toilet Floor Plan
c. Five Unit Toilet Floor Plan
d. Overview of Dock Area
e. New Aquatics Docks at Camp Thunderbird dated October 13, 2021
d. Camp Thunderbird Parking Lot & Emergency Vehicle Route dated October 11, 2021
e. Camp Thunderbird Water Supply – Well Protection Zones, dated October 2020
f. Dredging plans with route of travel via temporary pipe and area of proposed dredging
Attachment d1 Thurston County Public Works approval memo from Arthur Saint, PE dated April 19, 2023
Attachment e1 Thurston County Environmental Health approval memo from Amy Crass dated September 26, 2022 with email from Dawn Peebles dated July 20, 2023 with corrections to EH conditions 1 – 3.
Attachment f1 WA Dept. of Fish and Wildlife comments from Noll Steinweg dated April 27, 2023
Attachment g1 Comments from the Chehalis Tribe dated August 19, 2020
Attachment h1 WA State Department of Ecology’s comment letter, dated April 25, 2023
Attachment i1 WA State Department of Ecology’s comment letter, dated August 27, 2020
Attachment j1 Email from Kevin Hansen, Thurston County Hydrogeologist dated April 27, 2023 with Boy Scouts Water Right Certificate from May 31, 1974
Attachment k1 Email from Robert Wubbena to Shaun Dinubilo dated August 18, 2020 regarding Cultural Resources
Attachment l1 Email from Shaun Dinubilo to Robert Wubbena dated August 20, 2020 regarding Cultural Resources
Attachment m1 Communication Matrix from Thurston County CPED to Boy Scouts POC dated March 16, 2023
Attachment n1 Letter from Thurston County CPED to applicant’s POC Bob Wubbena dated January 27, 2021
Attachment o1 Comment email from Sharon Roberts dated May 22, 2023 with additional attached emails
Attachment p1 Comment email from Audrey Richards dated April 27, 2023
Attachment q1 Email from Robert Wubbena to Kevin Hansen (TC Hydrogeologist) dated April 27, 2023
Attachment r1 Email from Kevin Hansen (TC Hydrogeologist) to Scott McCormick, Associate Planner, CPED dated April 27, 2023
Attachment s1 Email from Kevin Hansen (TC Hydrogeologist) to Scott McCormick, Associate Planner, CPED dated April 27, 2023
Attachment t1 Email from Audrey Richards to Scott McCormick, Associate Planner, CPED dated April 26, 2023
Attachment u1 Email from Robert Wubbena to Thurston County Commissioners et. al. dated April 26, 2023 (responses to public comments)
Attachment v1 Email from Audrey Richards dated April 26, 2023 to Scott McCormick, Associate Planner, CPED
Attachment w1 Email from Robert Wubbena to Jim Partin with responses to comments dated April 26, 2023
Attachment x1 Email from Kimberly Sowa to Robert Wubbena with responses from Robert Wubbena dated April 26, 2023
Attachment y1 Email from Larry and Holly Raidel to Scott McCormick, Associate Planner, CPED et. al. dated April 26, 2023
Attachment z1 Email from Kimberly Sowa to Scott McCormick, Associate Planner, CPED dated April 26, 2023
Attachment a2 Email from Michael Patterson to Scott McCormick, Associate Planner, CPED et. al. dated April 26, 2023
Attachment b2 Email from Robert Wubbena to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment c2 Email from Arthur Saint, PE, TC Public Works to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment d2 Email from Waldermar Szwajkowski to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment e2 Email from Robert Beck to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment f2 Email from James Davis (JC Davis) to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment g2 Email from Dawn Peebles, TC Environmental Health to Scott McCormick, Assoc. Planner, CPED and Kevin Hansen, TC Hydrogeologist dated April 25, 2023 with email from John Brinton (resident)
Attachment h2 Email from Jim Partin to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment i2 Email from Robert Wubbena to Andrew Brinton dated April 25, 2023
Attachment j2 Email from Robert Wubbena to Scott McCormick, Assoc. Planner, CPED et. al. dated April 25, 2023
Attachment k2 Email from Teresa and Bob Glenn to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment l2 Email from Cole Walker to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment m2 Email from James Davis to Sara Develle TC BoCC et. al. dated April 25, 2023
Attachment n2 Email from Jeff Davis to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment o2 Email from Tom and Karen Anderson to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment p2 Email from James (JC) Davis to Scott McCormick, Assoc. Planner, CPED et. al. dated April 25, 2023
Attachment q2 Email from James Partin to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment r2 Email from Andrew Brinton to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment s2 Email from Thomasina Cooper, TC BoCC Assistant and John Brinton to Scott McCormick, Assoc. Planner, CPED et. al. dated April 25, 2023
Attachment t2 Email from Larry and Holly Raedel to the Thurston County Commissioners et. al. dated April 25, 2023
Attachment u2 Email from Kimberly Sowa to Scott McCormick, Assoc. Planner, CPED dated April 25, 2023
Attachment v2 Email from John Walker to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment w2 Email from Teresa & Val Szwajkowski to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment x2 Email chain from Larry & Holly Raedel and Teresa Szwajkowski to Robert Wubbena et. al. dated April 24, 2023
Attachment y2 Email from Larry & Holly Raedel to the Thurston County BoCC et. al. dated April 24, 2023
Attachment z2 Email and photos from Larry & Holly Raedel to the Thurston County BoCC et. al. dated April 24, 2023
Attachment a3 Email from Holly Raedel et. al. to Robert Wubbena dated April 24, 2023
Attachment b3 Email from Mark Naylor to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment c3 Email from Brian Fitzgerald to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment d3 Email from Taylor Marsh to Scott McCormick, Assoc. Planner, CPED et. al. dated April 24, 2023
Attachment e3 Email from Joseph Spacciante to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment f3 Email from John Brinton to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment g3 Email from Dan Eygabroad to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment h3 Email from Kelli Duvall to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment i3 Email from Griffin Squires to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment j3 Email from Jim Partin to Scott McCormick, Assoc. Planner, CPED dated April 24, 2023
Attachment k3 Email from Waldemar & Teresa Szwajkowski to Scott McCormick, Assoc. Planner, CPED et. al. dated April 23, 2023
Attachment l3 Email from Teresa Szwajkowski to Robert Wubbena et. al. dated April 23, 2023
Attachment m3 Email from Bruce and Sharon Roberts to Scott McCormick, Assoc. Planner, CPED et. al. dated April 22, 2023
Attachment n3 Email from Robert Wubbena to Teresa Yardy et. al. dated April 22, 2023
Attachment o3 Email from Robert Wubbena to Holly Raedel et. al. dated April 22, 2023
Attachment p3 Email from Robert Wubbena to Kathy Leitch et. al. dated April 22, 2023
Attachment q3 Email from Robert Wubbena to Bruce and Sharon Roberts et. al. dated April 22, 2023
Attachment r3 Email from Robert Wubbena to Larry and Holly Raedel et. al. dated April 22, 2023
Attachment s3 Email from Robert Wubbena to Teresa Szwajkowski et. al. dated April 22, 2023
Attachment t3 Email from Larry Raedel to Dan Collett, Robert Wubbena et. al. dated April 22, 2023
Attachment u3 Email from Teresa Szwajkowski to Scott McCormick, Assoc. Planner, CPED dated April 22, 2023
Attachment v3 Email chain from Scott McCormick, Assoc. Planner, CPED to Larry and Holly Raedel dated April 21, 2023
Attachment w3 Email from Teresa Szwajkowski to Scott McCormick, Assoc. Planner, CPED dated April 20, 2023
Attachment x3 Email from Larry Raedel to Scott McCormick, Assoc. Planner, CPED dated April 20, 2023
Attachment y3 Email from Teresa Yardy to Scott McCormick, Assoc. Planner, CPED dated April 19, 2023
Attachment z3 Email from Holly and Larry Raedel to Scott McCormick, Assoc. Planner, CPED dated April 18, 2023
Attachment a4 Email from Tom and Karen Anderson to Robert Wubbena et. al. dated March 31, 2023
Attachment b4 Email from Kevin Hansen, TC Hydrogeologist to Scott McCormick, Assoc. Planner, CPED, et. al. dated March 22, 2023
Attachment c4 Email from Brett Bures, TC CPED Planning Manager to Scott McCormick, Assoc. Planner, CPED dated March 6, 2023 Re: comments from JC Davis to the TC BoCC
Attachment d4 Email from Teresa Yardy to Scott McCormick, Assoc. Planner, CPED dated February 3, 2023
Attachment e4 Email from Robert Wubbena to Scott McCormick, Assoc. Planner, CPED et. al. dated September 30, 2021
Attachment f4 Letter from Ray Conner to Scott McCormick, Assoc. Planner, CPED (undated)
Attachment g4 Email from Larry and Holly Raedel to Scott McCormick, Assoc. Planner, CPED dated February 1, 2021
Attachment h4 Email from Robert Wubbena to Waldemar Szwajkowski et. al. dated January 19, 2021
Attachment i4 Email from Tom Anderson to Robert Wubbena, TC BoCC et. al. dated January 18, 2021
Attachment j4 Email from Robert Wubbena to CJ Russo et. al. dated January 18, 2021
Attachment k4 Email from Larry and Holly Raedel to Scott McCormick, Assoc. Planner, CPED dated January 16, 2021
Attachment l4 Email from Van and Teresa Szwajkowski to Scott McCormick, Assoc. Planner, CPED dated January 16, 2021
Attachment m4 Email response from Scott McCormick, Assoc. Planner, CPED to Tom Anderson dated January 11, 2021
Attachment n4 Email from Gary Poe to Scott McCormick, Assoc. Planner, CPED dated January 10, 2021
Attachment o4 Picture of Hearing Notice on Site. Installed July 19, 2023
Attachment p4 Affidavit of Hearing Notice Installation dated July 19, 2023
Exhibit 2 Environmental Health Memo and Jim Hunter & Associates letter and attachments
Exhibit 3- Public comments received after publication of the staff report
Exhibit 3a Public Comment from Kimberly Sowa, received August 7, 2023
Exhibit 3b Public Comment from Genevieve Young, received August 7, 2023
Exhibit 3c Public Comment from Reno Davis, received August 7, 2023
Exhibit 3d Public Comment from Kathy Leitch, received August 7, 2023
Exhibit 3e Public Comment from Bruce & Sharon Roberts, received August 7, 2023
Exhibit 3f Public Comment from Val and Teresa Szwajkowski, received August 7, 2023
Exhibit 3g Public Comment from Tom and Karen Anderson, received August 7, 2023
Exhibit 4- Post Hearing Comments
Exhibit 4a Public Comment from Bruce & Sharon Roberts, received August 10, 2023
Exhibit 4b Public Comment from Andrew Brinton, received August 10, 2023
Exhibit 5 Staff response to public comments, August 14, 2023
Exhibit 6 Environmental Health Staff response to public comments, August 14, 2023
Exhibit 7 Applicant response to public comments, August 14, 2023
Exhibits before the Hearing Examiner:
1. Staff Report and attachments below
Attachment a Notice of Public Hearing, July 10, 2023
Attachment b Master Application
Attachment c Reasonable Use Exception Application, dated September 17, 2021 and revised May 2, 2023
Attachment d additional RUE responses, dated May 2, 2023
Attachment e Revised site plan, dated October 17, 2022, and revised May 2, 2023
Attachment f Wetland Delineation Report, submitted August 4, 2021, and revised January 11, 2022
Attachment g1 Wetland Mitigation Plan, dated September 17, 2021, and revised May 2, 2023
Attachment g2 Figure 2 for the Wetland Mitigation Plan, Submitted May 2, 2023
Attachment h Impervious Surface Worksheet, dated October 17, 2022 and revised May 2, 2023
Attachment i Impervious Surface Addendum, dated October 17, 2022
Attachment j Inadvertent Discovery Plan, dated October 17, 2022
Attachment k Inadvertent Discovery Details, dated October 17, 2022
Attachment l Revised RUE narrative, October 17, 2022, and revised May 2, 2023
Attachment m Notice of Application for Reasonable Use Exception dated May 4, 2022
Attachment n Final Communications Matrix
Attachment o Approval memo from Lyndsey Smith with Thurston County Environmental Health, dated October 27, 2022
Attachment p Traffic Study
Attachment q Property Survey
Attachment r Public Comment
Attachment s Residential Conversion Plan Design
Attachment t Jim Henry septic email
Attachment u Well log and water tests
Attachment v On-site septic system record drawing
Attachment w Nisqually comment letter, Squaxin comment letter, and DAHP comment letter, dated October 11, 2021
Attachment x Accessory Structure Affidavit
Attachment y Applicant’s response to May 23, 2023 staff report
Attachment z Applicant’s Permaculture Plan
Exhibit 2 Applicant request for previous planners communications with staffs response, July 24, 2023
Exhibits before the Hearing Examiner:
1. Staff Report including the following attachments
Attachment a Notice of Hearing
Attachment b Zoning / Vicinity Map
Attachment c Master Application submitted on November 18, 2022
Attachment d JARPA Application submitted on November 18, 2022, revised April 17 2023
Attachment e Narrative description and site plans dated August 13, 2022
Attachment f Site photos submitted April 17, 2023
Attachment g SEPA MDNS issued July 5, 2023
Attachment h SEPA Environmental Checklist submitted November 18, 2022
Attachment i Notice of Application dated December 28, 2022
Attachment j Comment letter from Department of Ecology dated December 28, 2022, January 27, 2023 and follow up email dated April 27, 2023
Attachment k Eelgrass Survey dated August 13, 2022, and Army Corp Components of a Complete Eelgrass Delineation Report dated January 9, 2018
Attachment l Approval memo from Dawn Peebles with TC Environmental Health dated June 23, 2023
Attachment m Comment letters from the Nisqually Tribe dated January 3 and 4, 2023, and May 2, 2023
Attachment n Comment email from the Squaxin Tribe dated January 3, 2023
Attachment o Consistency Analysis of the Proposal for the SMA and SMPTR dated May 16, 2022
Attachment p Cultural Resource Assessment dated March 19, 2023 (not attached- available upon request)
Attachment q Pacific Coast Shellfish Growers Association Environmental Policies dated June 2001
Attachment r ESA Programmatic Verification: US Army Corp of Engineers: Enclosure 1. Conservation Measures and applicable terms and conditions from the Programmatic Biological Opinions for Shellfish Activities in Washington State Inland Marine Waters (US Fish and Wildlife Service (USFWS) Reference Number 01EWFW00-2016-F-0121, National Marine Fisheries Service (NMFS) Reference Number WCR-2014-1502)
Attachment s Sea Grant Washington, Geoduck Aquaculture Research Program, Final Report
to the Washington Legislature dated November 2013
Attachment t Harvest Site Certificates and Lease Agreement
Attachment u NOAA Programmatic Biological Opinion dated September 2, 2016
Attachment v Army Corp Programmatic Biological Assessment dated October 2015
Attachment w US Dept of Commerce Revised ITS and Biological Opinion Errata dated September 30, 2016
Attachment x USFWS Biological Opinion dated August 26, 2016
Attachment y Applicant response to Planning requests in matrix, submitted April 17, 2023
Attachment z Corrected JARPA Application received July 24, 2023
Exhibit 2 Comments received after publication of the staff report
Exhibit 2a Comment from Betsy Norton, received July 17, 2023
Exhibit 3 PowerPoint Presentation
Exhibit 4 Kelly McDonald Resume
Exhibit 5 Applicant Response to Public Comment
Exhibit 6 Declaration of Michelle Walker
Exhibit 7 2022 Programmatic Consultation Annual Report
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing
Attachment b Zoning map
Attachment c Master Application, submitted September 14, 2022
Attachment d Special Use Permit Application, submitted September 14, 2022
Attachment e Narrative summary, dated July 20, 2022
Attachment f Notice of Application, dated October 12, 2022, with adjacent property owners list dated October 11, 2022
Attachment g Revised site plan submitted June 22, 2023
Attachment h Landscape Plans received August 29, 2022
Attachment i Water System site plan dated April 2023
Attachment j Septic system site plan dated June 2022
Attachment k Comment Matrix dated March 2, 2023
Attachment l Trip Generation Memo by SCJ Alliance dated July 22, 2022
Attachment m Response memo from SCJ Alliance regarding Group B Well Site Application dated April 12, 2023
Attachment n Preliminary Drainage Report dated July 2022
Attachment o Site address memo dated October 14, 2022
Attachment p Drainage Scoping comments from Zach Severs, Thurston County Public Works, dated April 21, 2023
Attachment q Approval memo from Arthur Saint with Thurston County Public Works dated April 25, 2023
Attachment r Approval memo from Dawn Peebles with Thurston County Environmental Health dated June 5, 2023
Attachment s Comments from the Squaxin Tribal archaeologist dated October 19, 2022
Attachment t Comments from the Nisqually Tribal archaeologist dated October 17, 2022
Exhibit 2 Applicants submittal in response to order reopening the record
Exhibit 3 Staffs response to applicants submittal.
Exhibit 4 Parking easement and correspondence, received August 15, 2023
Hearing Audio (m4a format)
Exhibits before the Hearing Examiner:
1. Staff Report including attachments
Attachment a Notice of Public Hearing, June 26, 2022
Attachment b Master Application and Reasonable Use Exception application, received December 15, 2021
Attachment c Project Narrative, received March 30, 2023
Attachment d Site plan, received December 15, 2021 and revised on March 30, 2023, and May 16, 2023
Attachment e intentionally left blank
Attachment f Wetland Delineation and Mitigation Report, received December 15, 2021 and revised on March 30, 2023
Attachment g Impervious Surface Worksheet
Attachment h Comments from the Nisqually and Squaxin tribes
Attachment i Notice of Application for Reasonable Use Exception dated May 18, 2022
Attachment j Public comment, June 7, 2022
Attachment k Communications Matrix, dated March 30, 2023
Attachment l Critical Area Determination, dated January 25, 2023
Attachment m 2nd Communications Matrix, dated May 10, 2023
Attachment n 3rd Communications Matrix, dated May 16, 2023
Attachment o Thurston County Environmental Health approval memo, dated June 9, 2023
Exhibit 2 Applicant's memo in response to discrepancy of total square footage